BENALLA LANDFILL CELL 3A & 3B
Infrastructure Solutions was responsible for the design and all CQA Supervision for Cells 3A & 3B at the Benalla Landfill. Cell 3A has an approximate area of 1.14 Hectares and Cell 3B .53 of a Hectare. The construction work was predominately done in the first half of 2022.